500KW diesel generator with Cummins engine
Genset specification:
Engine: Cummins (KTAA19-G6A)
Alternator: Stamford ,HCI544F-S
Control panel: Digital display with ATS. (Smartgen brand)
Prime power: 500KW/ 625KVA
Frequency: 50Hz/60Hz
Phase: 3phase, 4wire, 12leads
Power factor: 0.8lagging
Standard configuration supply scope:
(1)Diesel engine with all accessories, 3 filter, electrical systems.
(2)Alternator.
(3)Steel structure.
(4)Fan and water cooling system.
(5)Flange connector.
(6)12V/24vstarting motor and charge engine.
(7)Air cleaner, fuel cleaner, oil cleaner.
(8)On-board control panel.
(9)MCCB air conservation switch.
(10)12V/24V starting accumulator and battery line.
(11)Set shock absorber.
Delivery term:
1. Port of loading: Fuzhou port
2. Port of destination: To be informed
3. Delivery time: 15-30 days after down payment
4. Payment terms: T/T 100% down payment or 30% deposit, 70% before delivery out of factory
5. Insurance: 110% of total amount
6. Failure Remedy: Free spare parts due to failures cause by the quality
Warranty
The goods are under warranty against defects in material and workmanship for a period of 12 months or 1000 hours, whichever come first from the date of delivery to the end user except the damageable spare parts of genset caused by incorrect man-made operation, and that the aforementioned warranty for the same taken is back up by the engine and alternator suppliers
Genset model |
GF3-C500KW |
Prime power |
500KW |
Specification of diesel engine |
Brand/Model: |
Cummins KTAA19-G6A |
Rated RPM: |
1500rpm |
Prime power at rated RPM |
550KW |
Max. Standby Power at Rated RPM: |
610KW |
Air Intake System: |
Turbocharged and Aftercooled |
Cylinder Arrangement: |
6 in line |
Cycle |
Four stroke |
Displacement: |
18.9L |
Bore and Stroke: |
159×159(mm) |
Compression Ratio: |
13:01 |
Governor Type: |
Electronic |
Exhaust System |
Exhaust Gas Flow: |
2054L/s |
Exhaust Temperature: |
584C |
Max Back Pressure: |
10kPa |
Air Intake System |
Max Intake Restriction: |
6.23kPa |
Burning Capacity: |
750L/s |
Fuel System |
100%(Prime Power) Load Consumption: |
206 g/Kw.h |
75%(Prime Power) Load Consumption: |
205 g/Kw.h |
50%(Prime Power) Load Consumption: |
206 g/Kw.h |
Oil System |
Total Oil Capacity: |
50L |
Oil Consumption: |
≤4g/kwh |
Cooling System |
Total Coolant Capacity: |
116.5L |
Thermostat: |
82-93C |
Max Water Temperature: |
104C |
Specification of Alternator |
Brand /model |
Stamford ,HCI544F-S |
Continous output (KW) |
500 |
Phase and connect |
3- phase ,4 wires,Y type connection |
Excition model |
Self-excite,automatic voltage regulation,H Brushless,Enclosusre:IP22-IP23 |
Power efficiency |
95.10% |
Voltage regulation |
±1.0% with 4% engine governing |
Waveform Distortion |
No load<1.5% and non-disttorting balanced lindear load <5% |
THF/TIF |
<2% <50 |
About us - BYC Power
* Manufacturer from Fujian, China
* Professional produce and inspect team more than 10 years experience
* 100% test on idle load,fully load and 10% overload before shipment
* ISO9001 quality control system and CE certification.
* 1 year guarantee
* Customerization supported
Main product and power range
1. Diesel generator 6-2500KVA
2. AC alternator 2-2500KVA
Warranty policy:
The goods are under warranty against defects in material and workmanship for a period of 12 months or 1000 hours ,whichever come first from the date of delivery to the end user except the damageable spare parts of genset caused by incorrect man-made operation, and that the aforementioned warranty for the same taken is back up by the engine and alternator suppliers.
Come here for more information, please:
FAQ
Q: Are you trading company or manufacturer ?
A: We are factory.
Q: What's your MOQ ?
A: MOQ: 1 unit.
Q: How long is your delivery time ?
A: 25 days against deposit.
Q: What's your payment term?
A: TT: 30% deposit and 70% balance before shipment.
LC: 100% irrevocable LC.
Q: What's your warranty period ?
A: The goods are under warranty for a period 12 months or 1000 hours
whichever comes first from the date of delivery to the end user
(except the damageable spares of genset caused by incorrect man-made operation)
Q: How to visit our factory ?
A: 2 hours from ChangLe, Fuzhou airport by car.
40 minus from Fuan Train Station.