Mitsubishi Open type Diesel Industrial Power Generator 1200kw
Prime power 1200kW,50Hz,1500rpm,powered by Mitshbishi engine S12R-PTAA2-C, coupled with Leroy-Somer alternator,Stamford,Marathon,ABB and Chinese brand alternator is optional.60HZ,1800rpm is available.
Genset Basic parameters |
Prime power kVA/KW |
1500/1200 |
Standby power kVA/KW |
1650/1320 |
Frequency HZ |
50 |
Phase & wires |
3&4 |
Fuel consumption(100%Load) L/H |
332 |
Fuel |
Diesel |
Engine |
Engine Model |
S12R-PTAA2-C |
No. of cylinders |
12 |
Bore x stroke mm |
170*180 |
Displacement L |
49.03 |
Engine speed RPM |
1500 |
Rated power KW/HP |
1277 |
Lubrication oil |
WD/40 |
Lubrication Oil capacity L |
180 |
Coolant capacity L |
317 |
Governor method |
Electronic |
Starting system |
Electric |
Alternator |
Power factor |
0.8 |
No. of poles |
4 |
Insulation |
H |
Voltage regulation |
±0.5% |
Excitation system |
Brushless,Self-excited |
Alternator model |
S7L1D-C41 |
Protection Grade |
IP23 |
Dimension & Weight-Open type |
Length mm |
5070 |
Width mm |
2200 |
Height mm |
2530 |
Weight kgs |
4500 |
Fuel tank capacity L |
without |
Forklift truck |
Yes |
Drag ring |
Yes |
Silent Canopy |
Length mm |
12000 |
Width mm |
2350 |
Height mm |
2680 |
Weight kgs |
5300 |
Fuel tank capacity L |
without |
Continuous runing hours (at 75% load) H |
10 |
Forklift truck |
Yes |
Lifting hole |
Yes |
Drag ring |
Yes |
TECHNOLOGY DATA OF MITSUBISHI SERIES DIESEL GENERATOR SET
Warranty:
12 months or 1000 running hours from shipment date. If the quality problem arise during the warranty period, and verified the problem is caused by our genset-body instead of external or natural reasons. (Refer to all kinds of natural disaster, shipping, loading, unloading, wrong-operation, etc), we will supply the relevant spare parts free of charge for maintenance; After the warranty period, we can supply the required spare parts for you under cost prices
FAQ
Q: Are you trading company or manufacturer ?
A: We are factory.
Q: What's your MOQ ?
A: MOQ: 1 unit.
Q: How long is your delivery time ?
A: 25 days against deposit.
Q: What's your payment term?
A: TT: 30% deposit and 70% balance before shipment.
LC: 100% irrevocable LC.
Q: What's your warranty period ?
A: The goods are under warranty for a period 12 months or 1000 hours
whichever comes first from the date of delivery to the end user
(except the damageable spares of genset caused by incorrect man-made operation)
Q: How to visit our factory ?
A: 2 hours from ChangLe, Fuzhou airport by car.
40 minus from Fuan Train Station.